An S/4HANA transformation needs a clear approach to the interfaces connecting its systems. Working within the architecture and integration team, Codemine expertise supported the introduction of SAP AIF at Daimler Truck, combining technical architecture with ABAP development leadership.
Client
Industry
Automotive
Period
2022–2024
Codemine role
Technical architecture and ABAP development leadership
Photo: HeinzWörth, CC BY-SA 3.0, via Wikimedia Commons
The interface foundation was set before the bulk of development started, so every team building on S/4HANA worked from the same AIF setup and the same rules.
01
Context
Daimler Truck moved its SAP landscape to S/4HANA as part of a transition project delivered with SAP. Interfaces to and from the new system were a separate area of the program, with its own architecture and integration team.
AIF had not been used in this landscape before. It was introduced greenfield, which meant the setup, the conventions and the guidance for developers all had to be created as part of the project.
02
The challenge
The transition required a greenfield AIF implementation and guidance for the development team that would build on it. The integration scope included IDocs, proxies, mass data processing and ETL, alongside performance and archiving considerations.
These demands called for both architectural decisions and hands-on development. The team needed a common foundation for interface delivery, with complex AIF topics addressed as part of the implementation.
03
Our approach
- 01
Greenfield AIF setup
The overall AIF setup was built from the ground up as the standard way to run and monitor interfaces in the new S/4HANA landscape.
- 02
Guidance for the development team
Alongside the setup came technical guidance for the developers who would build interfaces on it, so that later work followed one approach.
- 03
Architecture connected with development
Codemine contributed both to the architecture and integration team and to ABAP development leadership, connecting design decisions directly with hands-on development work.
- 04
Many interface types
The integration scope covered IDocs, proxies, mass data processing and ETL scenarios, each with different demands on AIF.
- 05
Performance and archiving
Consulting on complex AIF implementations included processing performance and archiving, so that the interface layer could run reliably at volume.
04
Results
A greenfield AIF foundation
The engagement established the AIF setup for integration development within the transformation.
Architecture linked to implementation
Technical architecture and ABAP leadership supported the development team’s delivery.
Coverage of complex integration scenarios
Work included IDocs, proxies, mass data and ETL.
Attention to operational requirements
Performance and archiving were addressed within the AIF implementation scope.
05
Technologies
SAP S/4HANA · SAP AIF · ABAP · IDoc · Proxy integration · ETL · Performance and archiving
Engagement delivered on behalf of SAP SE.
Preparing the integration layer for an S/4HANA transformation?
Talk to Codemine about AIF architecture, complex interface delivery and technical leadership for your development team.